Renovation of the observation deck including roof
replacement, new plaza deck system, waterproofing,
mechanical equipment replacement, rooftop planter
boxes, lighting, ADA compliance and other amenity
replacements. |
|
|
|
Setting
up & Staging Phase |
|
|
|
| The Pier structure extends 1,400
lineal feet into the bay. |
Weight restrictions of the bridge, required
that heavy loads of
material and debris be brought
to and from the facility by barge. |
Wood fencing was constructed around the work
areas for the safety of pedestrians. |
Demolition
& Installation Phases |
|
|
|
The roof was cut into small squares
by jackhammer and then removed
by power equipment. |
Completed waterproofing
membrane.
|
After the installation of the roof membrane,
insulation board is installed and then concrete pavers. This is
referred to as an “upside down roof”. |
|
|
|
| The existing canvass system was replaced. The existing
framing was sand blasted, primed and painted. |
The raised structure in the middle of the plaza deck was completely
waterproofed using an elastomeric coating. |
To the North and South sides, new lights with pedestal bases were
installed as well as new concrete benches. |
|