Fourteen different roofing and waterproofing systems
were utilized in over twenty-one different areas.
The renovation also included stucco, planter box waterproofing,
landscaping, canopy installation, plaza deck systems,
ADA compliance, reframing entire roof sections and
a multitude of amenity replacements. |
|
|
|
Main
Entrance Ramp Planter Boxes |
| |
|
|
|
|
|
Before photograph of planter
box, north side. |
Trees and foliage are removed. |
Emptied planter box before preparation. Much
of the concrete required repair. |
|
|
|
The area is clean, damaged concrete repaired
and the substrate primed. Next, stress flashings are installed. |
Base coat of waterproofing
system is installed. |
Finish coat of waterproofing system is installed. |
|
|
|
Completed planter box,
north side. |
Completed planter box, east end. |
Completed planter box, southwest side. |
| |
|
|
|
|
|
Original roof system with
“cushion deck” walkway system. |
Original roof system and access ramp once the
cushion deck was removed. |
Application of the Kemper fluid applied terrace
deck waterproofing system. |
|
|
|
New access ramp is framed (formed) before pouring
new concrete. |
Synthetic stucco surfacing was installed between
the new metal kick flashings and coping block. |
Pedestal paver system in progress. |
|
|
|
South Fifth floor terrace
deck, west end. |
North Fifth floor terrace deck, west end. |
Overview photo of the completed North terrace
deck with new canopy system. |
| |
|
|
|
|
|
Overview photograph of the existing tile roof
system on the North tower. |
In progress roof removal of
the seven story penthouse.
|
There was extensive termite and water damage
throughout the entire facility. |
|
|
|
New G-90 Steel framing was
installed to the bell towers.
|
New pressure treated plywood was installed over
the new steel framing. |
New stucco is installed to the bell tower. |
|
|
|
Pressure treated lumber was
used for all cap and pan stringers. |
New tile are installed to the south Sixth floor penthouse. |
Aerial photograph of tile roof installation. |
Set
Up Area & Traffic Control
|
|
|
|
The main thru fare is closed and traffic redirected.
A police officer and special permitting was required by the city. |
Materials are hoisted to the roof by crane. |
Barricades were installed for the safety of
pedestrians. |
|